All projects

Commercial Refrigeration

Dumplings Factory — Coolroom & Freezer Room Installation, Boronia

Dumplings Factory — Coolroom & Freezer Room Installation, Boronia

Coolroom and freezer rooms built for a dumplings factory in Boronia. Insulated panel rooms with heavy sliding doors and checker plate kick strips, with a twin-fan Cabero evaporator mounted inside to hold temperature.

Want something similar?

Call or text us. We'll assess the job on-site and give you a clear written quote.

More projects

Medical Centre — Ceiling Cassette Installation, Narre Warren South Commercial

Split System

Medical Centre — Ceiling Cassette Installation, Narre Warren South

Ceiling cassettes installed through a medical centre in Narre Warren South. A Mitsubishi Heavy Industries four-way cassette sits flush in the waiting room ceiling alongside linear supply diffusers, so reception, waiting area and consult rooms stay evenly conditioned.

Footscray Badminton Centre — Ducted System Installation Commercial

Ducted Reverse Cycle

Footscray Badminton Centre — Ducted System Installation

Ducted system installed at Footscray Badminton Centre. Two Daikin condensers sit in steel security cages against the back wall, feeding spiral and insulated flexible ductwork run through the ceiling void above the courts.